Overhead cranes—often called bridge cranes—are the quiet workhorses that keep heavy industry moving. This long-form walkthrough takes you behind the scenes of a mega-project crane install. We’ll cover rails and runway alignment—with the same checklists pro installers use.
Overhead Crane, Defined
At heart, a bridge crane is a bridge beam that spans between two runway beams, with a trolley that travels left-right along the bridge and a hoist that lifts the load. The system delivers three axes of motion: long-travel along the runway.
They’re the backbone of heavy shops and assembly lines, from beam handling to turbine assembly.
Why they matter:
Safe handling of very heavy, unwieldy loads.
Huge efficiency gains.
Lower risk during rigging, lifting, and transport inside facilities.
High throughput with fewer ground obstructions.
What This Install Includes
Runways & rails: continuous beams and rail caps.
End trucks: wheel assemblies that ride the rail.
Bridge girder(s): single- or double-girder configuration.
Trolley & hoist: reeving, hook block, upper limit switches.
Electrics & controls: VFDs, radio remote, pendant.
Stops, bumpers & safety: overload protection, e-stops.
Based on design loads and bay geometry, the crane might be a jj construction single-girder 10-ton unit or a massive double-girder 100-ton system. The choreography is similar, but the scale, lift plans, and checks grow with the tonnage.
Pre-Install Prep
A clean install is mostly planning. Key steps:
Drawings & submittals: Freeze the GA and verify reactions with the structural team.
Permits/JSAs: Job Safety Analysis (JSA) for each lift step.
Runway verification: Check baseplates, grout pads, and anchor torque.
Power readiness: Confirm conductor bars or festoon supports, cable trays, and isolation points.
Staging & laydown: Mark crane components with ID tags.
People & roles: Appoint a lift director, rigger, signaler, and electrical lead.
Millimeters at the runway become centimeters at full span. Measure twice, lift once.
Alignment That Saves Your Wheels
If rails are off, nothing else will run true. Targets and checks:
Straightness & elevation: Laser or total station to set rail height.
Gauge (span) & squareness: Check centerlines at intervals; confirm end squareness and expansion joints.
End stops & buffers: Install and torque per spec.
Conductor system: Mount conductor bars or festoon track parallel to the rail.
Record as-built readings. Correct now or pay later in wheel wear and motor overloads.
Lifting the Bridge
Rigging plan: Choose spreader bars to keep slings clear of electricals. Dedicated signaler on radio.
Sequence:
Install end trucks at staging height to simplify bridge pick.
For double-girder cranes, lift both girders with a matched raise.
Use drift pins to align flange holes; torque to spec.
Verify camber and bridge square.
Before anyone celebrates, bump-test long-travel motors with temporary power (under permit): ensure correct rotation and brake release. Lock out after test.
Cross-Travel Setup
Trolley installation: Hoist/trolley arrives pre-assembled or as modules.
Hoist reeving: Check rope path, sheave guards, and equalizer sheaves.
Limits & load devices: Check overload/SLI and emergency stop.
Cross-travel adjustment: Align trolley rails on a double-girder.
Pendant/remote: Install pendant festoon or pair radio receiver; function-test deadman and two-step speed controls.
A smooth trolley with a quiet hoist is a sign of good alignment. Fix the mechanics first.
Power with Discipline
Power supply: Drop leads tagged and strain-relieved.
Drive setup: Enable S-curve profiles for precise positioning.
Interlocks & safety: E-stops, limit switches, anti-collision (if multiple cranes), horn, beacon.
Cable management: Secure junction boxes; label everything for maintenance.
Future you will too. If it isn’t documented, it didn’t happen—put it in the databook.
ITP, Checklists, and Sign-Off
Inspection Test Plan (ITP): Hold/witness points for rail alignment, torque, electrical polarity, limit settings.
Torque logs: Record wrench serials and values.
Level & gauge reports: Note any corrective shims.
Motor rotation & phasing: Confirm brake lift timing.
Functional tests: Anti-collisions and zone interlocks.
A tidy databook speeds client acceptance.
Proving the System
Static load test: Apply test weights at the hook (usually 100–125% of rated capacity per spec).
Dynamic load test: Travel long-run, cross-travel, and hoist at rated speed with test load.
Operational checks: Emergency stop shuts down all motions.
Training & handover: Operator basics, daily pre-use checks, rigging do’s & don’ts.
When the logbook is clean, the crane is officially in service.
Where These Cranes Shine
Construction & steel erection: handling long members safely.
Oil & gas & power: generator and turbine assembly.
Steel mills & foundries: large part transfer.
Warehousing & logistics: high throughput lanes.
Once teams learn the motions, cycle times drop and safety improves.
Do It Safe or Don’t Do It
Rigging discipline: rated slings & shackles, correct angles, spreader bars for load geometry.
Lockout/Tagout: test before touch every time.
Fall protection & edges: scissor lifts and manlifts inspected.
Runway integrity: regular runway inspection plan.
Duty class selection: match crane class to cycles and loads.
A perfect lift is the one nobody notices because nothing went wrong.
Troubleshooting & Pro Tips
Crab angle/drift: re-check runway gauge and wheel alignment.
Hot gearboxes: adjust brake air gap and reduce VFD decel.
Rope drum spooling: dress rope and reset lower limit.
Pendant lag or dropout: antenna placement for radio; inspect festoon collectors.
Wheel wear & rail pitting: lubrication and alignment issues.
A 10-minute weekly check saves days of downtime later.
Fast Facts
Overhead vs. gantry? Bridge cranes ride fixed runways; gantries walk on the floor.
Single vs. double girder? Span and duty class usually decide.
How long does install take? Anything from a couple weeks to a few months.
What’s the duty class? FEM/ISO or CMAA classes define cycles and service—don’t guess; size it right.
What You’ll Take Away
Students and pros alike get a front-row seat to precision rigging, structural alignment, and commissioning. You’ll see how small alignment wins become big reliability wins.
Looking for a clean handover databook index you can reuse on every project?
Grab the installer pack and cut hours from setup while boosting safety and QA/QC. Bookmark this guide and share it with your crew.
...
Read more arabic articles...
read more about this products